Actually, the cost of unplanned downtime on account of equipment failure is higher than an equivalent duration of planned downtime; emergency stops in generation result in squandered product or service and unpredictable supply schedules. Reporting and report-maintaining: Each asset and motion may be logged in the CMMS and easily https://ashleym420ira8.blog4youth.com/profile