The railway follows its primary alignment aside from the Quarter Mile Bridge around Teepookana. The old bridge was washed absent in the flood in 1974, With all the new bridge just south of the original. [5] It is the proposal this line be transformed to standard gauge to facilitate the https://aaronn273jjj9.ttblogs.com/profile