The very first park includes a ability of 200 MW although Sandrini II contains a capacity of 100 MW. The whole expense of the two jobs were not disclosed on the other hand, throughout construction, in excess of two hundred personnel were being utilized. The jobs are anticipated to see https://californiasolarpanels.movie.blog/2024/11/26/4-things-to-consider-before-hiring-commercial-solar-installers/