Originally, the Jai Hind metro station was prepared being elevated. Nevertheless, the AAI objected the elevated stretch up to your airport may pose a risk to aircraft, Hence the route was even further reworked as well as station was shifted underground, 150 m within the Airport terminal constructing. The eligibility https://gallagherh320obp5.wikifrontier.com/user